SINCE OTHER THAN CITY OFFICIALS

[00:00:01]

AND ESSENTIAL

[*This meeting was joined in progress* Call to Order]

EMPLOYEES FROM BEING PHYSICALLY PRESENT, THE PUBLIC MAY VIEW THIS MEETING, SUBMIT COMMENTS ON AN ITEM ON THIS AGENDA, OR SUBMIT A PUBLIC COMMENT THROUGH THE ZOOM WEBINAR MEETING.

PLEASE CLICK ON THE Q AND A ICON IN THE ZOOM MEETINGS SCREEN TO SUBMIT THE PUBLIC COMMENT.

PUBLIC COMMENTS WILL BE ACCEPTED UNTIL THE CONCLUSION OF THE PUBLIC HEARING ON EACH ITEM.

PLEASE MAKE SURE TO INCLUDE THE ITEM, NUMBER OR NAME IN THE COMMENT.

COMMENTS WILL BE LIMITED TO 300 WORDS AND WILL BE ENTERED INTO THE OFFICIAL COMMISSION MEETING RECORD.

PUBLIC COMMENTS ARE BEING ACCEPTED NOW.

PLEASE SUBMIT YOUR COMMENTS AS SOON AS POSSIBLE.

YOU DO NOT NEED TO WAIT UNTIL AN ITEM IS CALLED TO SUBMIT A COMMENT.

COMMENTS WILL BE READ DURING THE MEETING COMMISSIONERS.

IF YOU HAVE A QUESTION OR COMMENT, PLEASE RAISE YOUR HAND AND WAIT TO BE RECOGNIZED BY THE CHAIR DUE TO ZOOM LIMITATIONS.

ONLY ONE PERSON MAY SPEAK AT A TIME AND TONIGHT FOR OUR FLAG SALUTE, WE ARE GOING TO GO AHEAD AND REMAIN SEATED SO THAT WE'RE NOT ALL OFF SCREEN WHEN WE DO THE SALUTE.

AND I ASK THAT, UH, EVERYONE MUTE SO THAT THERE'S ONLY ONE VOICE FOR THE FLAG SALUTE SO THAT WE ARE IN SYNC.

ALL RIGHT, RIGHT.

HAND SALUTE.

READY? BEGIN.

I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA AND TO THE REPUBLIC FOR WHICH IT STANDS ONE NATION UNDER GOD, INDIVISIBLE WITH LIBERTY AND JUSTICE FOR ALL THE MOMENTS OF SILENCE.

ALL RIGHT, LAURA, MAY WE HAVE ROLL CALL PLEASE? OH, LAURA, YOU ARE MUTED.

ALL RIGHT.

UH, COMMISSIONER SERCO PRESENT, UH, COMMISSIONER MOROSE, PRESENT COMMISSIONER PAULA BROOD AND COMMISSIONER.

SO TODAY IS THAT ALL COMMISSIONERS PRESENT.

THANK YOU.

WELCOME TO THE ELK COUNTY PLANNING COMMISSION MEETING APPEALS AND FINAL DECISIONS.

THE PLANNING COMMISSION CAN BE MADE THAT ARE MADE THIS EVENING MUST BE FILED IN WRITING WITH THE CITY CLERK BEFORE 5:00 PM, FRIDAY, FEBRUARY 26, 2021.

AND MUST INCLUDE THE PAYMENT OF A FILING FEE PURSUANT TO CITY COUNCIL RESOLUTION NUMBER ONE, ONE FOUR DASH SEVEN NINE, A COMMISSIONER WHO HAS RECEIVED EVIDENCE RELATED TO A MATTER BEFORE THE PLANNING COMMISSION, OTHER THAN AN UNSCORED VIEW OF THE SUBJECT PROPERTY IS REQUIRED TO DISCLOSE SUCH INFORMATION AT THE HEARING.

AT THIS TIME, WE WILL TAKE COMMENTS FROM ANY MEMBER OF THE PUBLIC ON ANY ITEM BUSINESS, WITHIN THE JURISDICTION OF THE COMMISSION THAT IS NOT ON THE AGENDA UNDER STATE LAW.

NO ACTION CAN BE TAKEN ON ITEMS BROUGHT FORWARD UNDER PUBLIC COMMENT EXCEPT TO REFER IT TO STAFF FOR ADMINISTRATION OR PLACE IT ON A FUTURE AGENDA.

AND AS I SAID PREVIOUSLY, AT ANY POINT THAT YOU HAVE AN ITEM, A COMMENT FOR PUBLIC COMMENT ON THE ITEMS ON THE AGENDA, YOU MAY PUT THOSE IN, IN THE Q AND A SECTION OF THE ZOOM SCREEN.

UH, THIS IS THE TIME FOR THE PUBLIC TO ADDRESS THE COMMISSION BY SUBMITTING THEIR COMMENTS BY Q AND A IN ZOOM, WE WILL GO AHEAD AND WAIT A FEW MOMENTS AND CURRENTLY IT LOOKS LIKE WE HAVE NO QUESTIONS OR COMMENTS.

ALL RIGHT.

[Consent Calendar]

WE WILL MOVE ON TO THE CONSENT CALENDAR.

A SINGLE MOTION WILL COVER ALL ITEMS ON THE CONSENT CALENDAR.

DOES THE COMMISSION WISH TO PULL FROM THE CONSENT CALENDAR NUMBER? SURE.

ALL RIGHT.

DOES STAFF WISH TO PULL A CONSENT CALENDAR ITEM FOR DISCUSSION? NO, WE DID NOT.

ALL RIGHT.

AND ALL WE NEED IS A MOTION AND A VOTE.

I MOVE TO ADOPT A SECOND.

THAT, OKAY.

MOTION MADE BY COMMISSIONER.

SECONDED BY COMMISSIONER ROSE.

ROLL VOTE, PLEASE.

SURE.

SO TODAY, YES.

COMMISSIONER POLAK RUDE.

YES.

COMMISSIONER MOROSE.

YES.

AND COMMISSIONER CIRCLE.

YES.

RIGHT.

IT'S UNANIMOUS.

[00:05:02]

RIGHT.

WE'LL MOVE

[Public Hearing Item 2]

ON TO OUR PUBLIC HEARING.

THE AGENDA ITEMS. NUMBER TWO, PROJECT NAME IS NORTH JOHNSON, ENERGY CENTER, BATTERY STORAGE.

THIS IS A REQUEST FOR AN ENERGY STORAGE FACILITY.

IT IS SEQUEL EXEMPT AND STAFF IS RECOMMENDING APPROVAL STAFF.

OKAY, GOOD EVENING.

OKAY.

UH, OKAY.

ALL RIGHT.

THE, UH, NORTH JOHNSON ENERGY CENTER BATTERY STORAGE FACILITY, LET'S SEE HERE.

CONDITIONAL USE PERMIT, UH, 2019 DASH ZERO ZERO ZERO EIGHT.

UH, PROP THE PROPOSED PROJECT LOCATED AT TWO 22 NORTH JOHNSON AVENUE WOULD INCLUDE A TWO-PHASE 50 MEGAWATT BATTERY STORAGE FACILITY LOCATED WITHIN THE SAME PROPERTY AS THE EXIST EXISTING PEAKER PLANT.

THE FIRST PHASE WOULD PLACEMENT OF 32 BATTERIES, UH, STORAGE CONTAINERS, SORRY, AND A 10 FOOT TALL SCREENING FENCE, UH, WITHIN THE EXISTING PARKING LOT.

THE SECOND PHASE WOULD INCLUDE AN ADDITIONAL 32 BATTERY STORAGE CONTAINERS AND THE DEMOLITION OF THE EXISTING COMMERCIAL BUILDING AND SERVICE STRUCTURE.

EACH PHASE WOULD ACCOUNT FOR 25 MEGAWATTS FOR THE COMBINED 50 MEGAWATT FACILITY.

THIS WOULD DECREASE THE LIKELIHOOD OF A LOCAL POWER OUTAGE BY PROVIDING FREQUENT STABILITY TO THE SDG NEW SYSTEM.

AND WE'LL DELIVER POWER TO HELP AVOID BLACKOUTS.

THE PROPERTY HAS A GENERAL PLAN DESIGNATION OF L I LIGHT INDUSTRIAL AND THE ZONING DESIGNATION OF CM, HEAVY COMMERCIAL LIGHT MANUFACTURING.

THIS IS CONSIDERED A UTILITY USE, THEREFORE REQUIRES A CONDITIONAL USE PERMIT.

UH, THIS IS THE AERIAL IMAGE OF THE PROPERTY LOCATED ON THE CORNER OF BENEDICT AND NORTH JOHNSON AVENUES.

THE PROPERTY TO THE WEST IS A SELF STORAGE FACILITY AND THE PROPERTY TO THE SOUTH IS THE STG AND E FACILITY.

UH, THE LARGER STRUCTURE TOWARD THE CENTER HERE IS THE PEAKER PLANT.

WELL, THIS IS THE EXISTING BUILDING AND ACCESSORIES, UH, SERVICE STRUCTURE BESIDE IS APPROXIMATELY 2.2, ONE ACRES IN SIZE AND INCLUDES AN EXISTING 3,908 SQUARE FOOT BUILDING AND 4,135 SQUARE FOOT STRUCTURE.

AS MENTIONED, THE SITE INCLUDES THE OPERATING PEAKER PLANT, WHICH WAS APPROVED IN 2009 UNDER CONDITIONAL USE PERMIT 2100 AND IS SURROUNDED WITH CONSISTENT LAND USES.

THERE ARE NO SENSITIVE USES IN THE VICINITY THAT WOULD BE IMPACTED.

OKAY.

SO PHASE ONE WOULD PLACE THE BATTERIES WITHIN THE EXISTING PARKING SPACES IN FRONT OF THE EXISTING BUILDING, ALONG WITH THE SCREENING FENCE PLACE, APPROXIMATELY 24 FEET AWAY FROM THE PROPERTY LINE ALONG BENEDICT AND 28 FEET AWAY FROM THE NORTH JOHNSON PROPERTY LINE, THE PHASE TWO WOULD, WOULD REMOVE THE BUILDINGS AND SERVICE STRUCTURES.

OKAY.

THE SITE PLAN INDICATES THE BLUE FIGURES AS THE PHASE ONE BATTERY STORAGE CONTAINERS.

WHILE THE RED INDICATES A PHASE TWO, THERE IS AN INTERCONNECTING DRIVEWAY WITH ENTRANCE ALONG BENEDICT AND ALONG NORTH JOHNSON AVENUE, THE EXISTING BUILDING AND STRUCTURE CAN BE SEEN UNDER THE RED CONTAINERS WHILE THE PEAKER PLANT IS ADJACENT.

THE DRIVEWAY, THE BATTERY EQUIPMENT WOULD BE OWNED AND OWNED AND OPERATED BY THE APPLICANT.

IT WOULD ALSO BE INTEGRATED INTO THE EXISTING SDG NE TRANSMISSION LINE.

IT WOULD INCLUDE 24 HOURS A DAY, SEVEN DAYS A WEEK, REMOTE MONITORING.

AND THE DIMENSIONS OF THE CONTAINERS WOULD DEPEND ON THE VENDOR, ALTHOUGH WOULD NOT EXCEED THE HEIGHT OF THE SCREENING FENCE, WHICH IS 10 FEET.

FOR EXAMPLE, THE APPLICANT PROVIDED, UM, A TESLA MEGA STACK MODEL THAT WAS USED FOR THE SITE PLAN, WHICH HAS DIMENSIONS OF APPROXIMATELY 23 FEET IN LENGTH, UH, FIVE FEET IN WITH AND 19 HEIGHT.

THESE PLANS WERE ALSO REVIEWED AND APPROVED BY HARTLAND FIRE AND RESCUES HAZARDOUS MATERIAL MANAGEMENT PLAN.

OKAY, HERE'S AN IMAGE OF THE TESLA MEGA STACK MODEL THAT WAS USED FOR THE SITE PLAN.

[00:10:01]

THE ELEVATION SHOW, THE PROPOSED CORRUGATED SCREEN FENCE TO BE, TO INCLUDE A MATCHING COLORS TO THE EXISTING SITE.

UH, FENCING ALONG WITH FULL COLUMNS WITH, UH, LIGHTING FEATURES THIS ALONG WITH IMPROVED LANDSCAPING TO IMPROVE THE APPEARANCE FROM LAURA JOHNSON AND BENEFITS.

THERE IS AN EXISTING ROD IRON FENCE ALONG THE EXTERIOR OF THE PROPERTY THAT WILL REMAIN THE FOLLOWING IMAGES ARE OF THE SITE ALONG THE EXTERIOR, SHOWING THE EXISTING RUN IRON FENCING, LANDSCAPING, AND RED SCREEN FENCE.

THIS IS A IMAGE FROM A LONG NORTH JOHNSON, AND THIS IS ONE ALONG BENEDICT, AS YOU CAN SEE, IT STILL HAS THE RUNNER FENCING, LANDSCAPING AND A RED SCREENING FENCE.

THEREBY STAFF RECOMMENDS A SQL CLASS THREE EXEMPTION AND APPROVAL OF CONDITIONAL USE PERMIT NUMBER 2019 DASH ZERO ZERO ZERO EIGHT, UH, SUBJECT TO CONDITIONS.

YEAH, THANK YOU.

UM, I HAVE ONE QUESTION THAT I FORGOT TO ASK EARLIER.

UH, I WAS GOING TO LOOK UP HOW MUCH ENERGY IS A MEGAWATT.

WE GOT 50 MEGAWATTS OF STORAGE AT A 49 MEGAWATT PEAKER PLANT WHEN THIS IS AN OPERATION.

IF WE WERE TO HAVE A LOCAL BLACKOUT THAT WOULD SUPPLY OUR GRID WITH ENERGY FOR HOW MANY HOURS OR HOW MANY, OR MAYBE BOTH SINCE THEY BOTH PLAY FACTORS, THE AMOUNT OF I'M NOT TOO FAMILIAR WITH THE AMOUNT OF ENERGY THAT COULD LAST FOR, UM, WE'VE INVITED OUR APPLICANT, UH, WHO CAN MAYBE ELABORATE AND GIVE US SOME MORE TECHNICAL DETAILS ON THAT.

IF YOU DON'T MIND.

I DON'T MIND GAVIN.

I HAVE A QUICK QUESTION TOO.

IT DOESN'T REPLACE THE, UM, THE TURBINE THAT'S THERE, CORRECT? THAT TURBINE STAYS THAT'S CORRECT.

IT, IT STAYS IT'S, UM, IT'S KIND OF LIKE AN ACCESSORY TO THE, TO THE, TO THE PEAKER PLANT.

UM, WHAT RAIN REMOVED IS, UM, LIKE THE PREVIOUSLY A COMMERCIAL BUILDING THAT HASN'T BEEN OCCUPIED FOR A LONG TIME.

THAT'S, THAT'S REALLY THE THING THAT'S BEING REMOVED.

GREAT.

CAUSE I BELIEVE THERE'S TWO TURBINES OVER THERE NOW.

CORRECT.

UH, I'M NOT FAMILIAR WITH THE, UH, THE NUMBER OF TURBINES, BUT I KNOW THAT THE PEAKER PLANTS THERE AND IT'S NEXT TO THE STG FACILITY.

OKAY, COOL.

YEAH.

SO THIS IS ADDING STORAGE TO A PRODUCTION FACILITY.

YES.

UM, MR. SO TLA, WHAT IS A CLASS THREE EXEMPTION WHICH ARE CAMACHO? IT WOULD BE THE, UM, UH, NEW FACILITIES UNDER, UM, SMALL STRUCTURES.

SO WE WOULD HAVE, UM, IT'S, UH, 1503 IT'S, UM, IT COVERS, UM, STRUCTURE.

SO THIS WOULD BE CONSIDERED AN, UH, STRUCTURE FACILITY BECAUSE IT'S NOT A, THERE'S NO INVOLVEMENT OF LIKE A BUILDING OR JUST LIKE THAT.

IT'S REALLY JUST PLACEMENT OF EQUIPMENT WITH A SCREEN FENCE, BUT EVENTUALLY THERE'LL BE NO BUILDINGS ON THAT PROPERTY WHATSOEVER, OTHER THAN THE BATTERIES.

YES.

THANK YOU, CHAIRMAN.

SERCO JUST SO YOU KNOW, A MEGAWATT CAN POWER ABOUT 650 HOUSES, 650 HOUSES FOR AN HOUR.

OKAY.

UH, LET'S TAKE A LOOK HERE KILOWATT HOUR.

I JUST NOT SAY HERE, BUT LET'S TAKE A LOOK HERE.

I THINK THAT'S ANNUALLY COULD BE WRONG, BUT LET ME TAKE A LOOK HERE.

WELL, I'LL LET THE APPLICANT ANSWER AS WELL.

YEAH.

HOPEFULLY THAT, YOU KNOW.

ALL RIGHT.

UM, I THINK THAT'S ALL THE QUESTIONS FOR STAFF FROM OUR COMMISSION.

SO LET'S GO AHEAD AND OPEN UP THE PUBLIC HEARING AND STAFF, DO WE HAVE, I WANT TO SAY SPEAKER CARDS, BUT WE DON'T USE SPEAKER CARDS ANYMORE.

WE DO NOT HAVE ANY SPEAKER CARDS.

UM, BUT IF ANY OF THE MEMBERS IN ATTENDANCE WOULD LIKE TO THEIR HANDS OR INDICATE IN THE Q AND A I'D LIKE TO SPEAK, I CAN GO AHEAD AND UNMUTE THEM.

SO I SEE GARY FRANZEN HAS INDICATED, WOULD YOU LIKE ME TO ALLOW HIM TO SPEAK?

[00:15:01]

YES, PLEASE.

GO AHEAD.

CAN YOU HEAR ME OKAY? YES, WE CAN HEAR YOU.

WELL, THANK YOU.

UM, GOOD EVENING COMMISSIONERS.

WE NEED MEAN STAFF.

THANK YOU FOR TAKING TIME OUT OF YOUR DAY, YOUR EVENING TO, UH, YOU HEAR THIS PROPOSAL, UM, APPRECIATE THE TIME THAT YOU'VE SPENT ON IT THIS FAR.

AND, UM, WE ALSO HAVE MARK JURGENSON AND CRAIG MOURN WITH, UH, WITH OUR COMPANY THAT, UH, WHO CAN, CAN OFFER MORE ANSWERS TO QUESTIONS IF I DON'T COVER THEM ALL.

SO, UM, MR. MOROSE WAS CORRECT IN THAT, UH, YOU KNOW, IT'S ROUGHLY 650 HOMES PER MEGAWATT.

AND THE WAY TO THINK ABOUT THAT IS THAT THAT'S AN INSTANTANEOUS LOAD.

IT'S NOT A DURATION ANSWER.

UM, THE WAY TO THINK ABOUT DURATION IS, UM, HOW LONG IT'S GONNA LAST.

AND SO THE SYSTEM, THE SYSTEMS THAT ARE BEING PROPOSED FOR THIS SITE ARE FOUR-HOUR SYSTEMS. SO IT'S 50 MEGAWATTS.

UM, THAT WILL LAST FOR FOUR HOURS WHEN I'M COMPLETELY BUILT OUT.

AND THE FOUR-HOUR SYSTEM IS KEY, UM, FROM A, UH, CALIFORNIA INDEPENDENT SYSTEM OPERATOR PERSPECTIVE.

AND THAT THAT'S WHAT THEY REGARD AS A, YOU KNOW, UH, BEING NECESSARY FOR RESOURCE ADEQUACY.

SO, UM, 200 MEGAWATT HOURS, 50 MEGAWATTS IS THE SIZE OF THIS PARTICULAR SYSTEM.

ALL RIGHT.

THANK YOU, MR. BRANSON, UH, DO ANY PLANNING, COMMISSIONERS HAVE ADDITIONAL QUESTIONS FOR THE APPLICANT? NO.

ALRIGHT, THANK YOU, MR. FRANZEN.

UM, ARE THERE ANY MEMBERS OF THE PUBLIC WHO HAVE QUESTIONS FOR THE APPLICANT OR FOR THE PLANNING COMMISSION OR FOR STAFF MR. CHAIR? I DO NOT SEE ANYONE INDICATING A DESIRE TO SPEAK AT THIS TIME.

UM, GETTING THAT VIEW.

THANK YOU.

ALL RIGHT.

I'M GOING TO GO AHEAD AND MAKE A MOTION TO CLOSE THE PUBLIC HEARING.

ALL RIGHT.

MOTION MADE BY COMMISSIONER.

SERCO SECOND BY COMMISSIONER ROSE.

ROLL ROBO PLEASE.

YES.

COMMISSIONER MOROSE.

YES.

COMMISSIONER PAWLIK RUDE.

YEAH.

AND COMMISSIONER.

SO TAYLOR MOTION IS CARRIED AND THE PUBLIC HEARING IS NOW CLOSED.

UM, WE JUST RECENTLY, I THINK ASKED MOST OF OUR QUESTIONS ON THE PROPOSED FACILITY FOR THESE COUNTY ATTORNEYS THAT'S, YOU KNOW, REALLY BEING CENTERED.

SO THIS IS MORE ENERGY STORAGE FOR OUR LOCAL AREA.

AND, UH, THIS IS A GOOD PLACEMENT FOR THIS PROJECT.

IT'S ALREADY ON UTILITY, ON PROPERTY ALREADY UTILIZED FOR ENERGY PRODUCTION.

SO HAVING ENERGY PRODUCTION IN STORAGE NEXT TO EACH OTHER MEANS TRANSMISSION IS GOING TO BE, UH, NOT A BIG DEAL.

SO THIS IS ANOTHER STEP BOARD FOR THE CITY OF ELK HOME.

AND I THINK IT'S A GOOD ONE.

ANY COMMENTS OR DISCUSSION FROM THE PLANNING COMMISSION BEFORE WE CONTINUE ON? I AGREE.

ALL RIGHT.

I WILL ENTERTAIN THE MOTION OR I'LL MAKE A MOTION.

OKAY.

I MOVED TO THE TOP, THE NEXT RESOLUTION IN ORDER APPROVING THE PROPOSED SEQUEL EXEMPTION AND CONDITIONAL USE PERMIT NUMBER 2019 DASH ZERO ZERO ZERO EIGHT.

SUBJECT TO CONDITIONS.

I SECOND THAT MOTION MADE BY COMMISSIONER.

SERCO SECONDED BY COMMISSIONER.

SO TLA ROLL VOTE, PLEASE.

OKAY.

UH, COMMISSIONER.

SO DELAY.

YES.

COMMISSIONER POLICK RUDE.

YEP.

COMMISSIONER MOROSE.

YES.

AND COMMISSIONER SERCO YES.

MOTION CARRIES FOUR ZERO.

ALL RIGHT.

AND SINCE THIS IS NOT MOVING ON TO THE CITY COUNCIL, ANYBODY WHO WISHES TO MAKE AN APPEAL FOR THIS DECISION OF THE PLANNING COMMISSION MUST MAKE

[00:20:01]

A, UH, AN APPEAL IN FILE.

MUST FILE AN APPEAL IN WRITING WITH THE CITY CLERK BEFORE 5:00 PM, FRIDAY, FEBRUARY 26, 2021.

IT MUST INCLUDE THE PAYMENT OF A FILING FEE.

AND GENTLEMEN, THANK YOU FOR THIS PROJECT IN EL CAJON, WE LOOK FORWARD TO SEEING IT BUILT OUT.

ALL RIGHT.

AND I BELIEVE THAT'S THE LAST ITEM OF PUBLIC HEARINGS.

ARE THERE ANY ITEMS

[5. STAFF COMMUNICATIONS]

FOR CONSIDERATION OR STAFF COMMUNICATIONS? THANK YOU THOUGH.

I DO HAVE A COUPLE OF ITEMS, UM, FOR STAFF COMMUNICATIONS.

THE FIRST IS I WANTED TO MAKE THE COMMISSION AWARE THAT THE, UM, PERIOD OF APPLICATION FOR THE VACANCY ON THE PLANNING COMMISSION HAS BEEN EXTENDED TO MARCH 3RD, AT 5:00 PM.

THE APPLICATIONS ARE AVAILABLE IN THE CITY CLERK'S OFFICE AND ALSO ON OUR WEBSITE.

UM, AND SO IF YOU KNOW OF ANYONE WHO'S INTERESTED IN LUTSEN, OKLAHOMA, PLEASE ENCOURAGE THEM TO APPLY.

UM, THE SECOND IS I DID WANT TO DO JUST A REAL BRIEF UPDATE ON PROJECTS, UM, UNDER CONSTRUCTION, UNDER DERBY IN OKLAHOMA.

SO HOPEFULLY YOU ALL CAN SEE THAT PRETTY WELL.

UM, I'LL GO THROUGH IT FAIRLY QUICKLY.

CAUSE I THINK SOME OF THESE ARE PRETTY FAMILIAR TO YOU.

UM, BUT THOSE THAT WE HAVE UNDER CONSTRUCTION RIGHT NOW WOULD BE THE LEGACY TOWNHOMES PROJECT, THE 41 NEW TOWN HOMES, UM, ON EAST WASHINGTON AND SOUTH DEANZA.

UM, AND THAT'S MOVING ALONG QUITE QUICKLY.

THESE ARE ALL RECENT PICTURES AS OF, UM, ABOUT A WEEK AND A HALF AGO.

THE NEXT IS THE ROCKY HILL POINT PROJECT ALSO OUT ON EAST WASHINGTON, THAT'S 26 NEW TOWNHOMES.

UM, THINGS STARTED TO PAINT THEM AND DO THE EXTERIOR WORK.

AND I DO BELIEVE THEY HAVE SOME OF THOSE UNITS ON THE MARKET.

A NEW PROJECT FOR DOWNTOWN IS THE LEXINGTON AVENUE APARTMENTS AT TWO 35 EAST LEXINGTON.

IF YOU HAVEN'T BEEN BY THERE RECENTLY, UM, CONSTRUCTION IS GOING ON QUITE RAPIDLY THERE.

AND I THINK THAT'S GOING TO BE A GREAT ADDITION TO OUR DOWNTOWN AREA.

UM, WE ALSO HAVE THE WELLS PROJECT, UM, AT ONE 72 WELLS FOR NEW TOWN HOMES UNDER CONSTRUCTION.

AND, UM, IF YOU DRIVE ON THE INTERSTATE EIGHT, ANYTIME YOU SEE THE NEW MAZDA DEALERSHIP GOING UP THERE, UM, ON JOHNSON AVENUE, NO NEW UPDATES ON THE MAIN STREET MIXED USE PROJECT.

UM, THAT PROJECT STILL HAS A BUILDING PERMIT ISSUED.

UM, AND WE'RE HOPING TO SEE THE APPLICANT START MOVING ON THAT SOON FOR THAT NEW 15 UNIT RESIDENTIAL AND 10,000 SQUARE FEET OF MIXED USE SPACE.

UM, THERE'S ALSO A NEW INDUSTRIAL BUILDING GOING UP AT EIGHT 50 WEST BRADLEY, UM, PART OF AN EXISTING, UH, MANUFACTURER.

AND THEN AT EIGHT 15 NORTH SECOND, YOU MAY HAVE NOTICED THE OLD GREEN APPLE MARKET WAS DEMOLISHED AND A NEW STARBUCKS, UM, AND STARTING CONSTRUCTION AT THAT LOCATION PHASE OF THE INDUSTRIAL PROJECT, UM, IS GETTING EVER CLOSER.

I THINK THEIR BUILDING PERMITS ARE JUST ABOUT READY TO ISSUE.

SO WE SHOULD EXPECT TO SEE SOME MOVEMENT ON THAT, UH, SECOND PHASE OF THAT PROJECT.

AND THEN THE MARSHALL PERSONAL STORAGE PROJECT THAT YOU HAD THE FORTUNE OF SEEING TWICE COME TO THE PLANNING COMMISSION.

UM, THEY HAVE BUILDING PERMITS UNDER REVIEW RIGHT NOW THAT'S FOR THAT NEW 60,000 SQUARE FOOT SELF STORAGE BUILDING.

UM, ANOTHER PROJECT THAT YOU'LL SOON SEE, SEE SOME NEW, UM, EXTERIOR IMPROVEMENTS AS WAS QUITE A FEW INTERIOR IMPROVEMENTS IS THE LEXINGTON SENIOR APARTMENTS PROJECT.

THAT'S, UH, AFFORDABLE HOUSING SENIOR PROJECT AT TWO 50 EAST LEXINGTON.

UM, AND THERE IS A $9 MILLION RENOVATION PROJECT, UM, UNDERWAY THERE TO EXTEND THE LIFE OF THAT BUILDING AND MAKE SOME IMPROVEMENTS AND ADDRESS SOME LONG DEFERRED MAINTENANCE THERE.

UM, AND THEN THE PARKWAY PLAZA, SELF STORAGE.

SO IN THE BASEMENT LEVEL OF PARKWAY PLAZA MALL, UM, THAT PROJECT IS NOW UNDER REVIEW ON THE BUILDING SITE AS WELL.

UM, AND THEN I DID WANT TO JUST, UM, BRING UP SOME OF THE PROJECTS THAT WE HAVE UNDER REVIEW, UM, THAT WILL BE COMING BEFORE YOU WOULD BE THE EXPANSION OF THE ST.

MADELINE SOPHIE CENTER.

UM, THE BANQUET HALL AT 1120 BROADWAY.

WE HAVE SOME NEW TOWNHOUSES PROPOSED OUT ON OAKDALE IN DURHAM, A NEW GAS STATION AT SOUTH MOLLISON, A MIXED USE CONVERSION AT THREE 30 WEST LEXINGTON, UM, AND SOME ADDITIONAL, UM, CONDOMINIUMS AT 1369 EAST TO MAINE.

THERE'S

[00:25:01]

ALSO PROPOSED, UM, 140,000 SQUARE FOOT DISTRIBUTION CENTER WITH WAREHOUSE OFFICE SPACE AND PARKING ON THE VACANT WELD IN QUIA MACA PROPERTY.

UM, THAT'S ENDING APPROVAL AND YOU WILL SEE BACK BEFORE YOU THE MAGNOLIA HEIGHTS PROJECT.

SO THAT'S A PLANNED RESIDENTIAL DEVELOPMENT.

THAT'LL BE COMING BACK TO YOU AS THEY LOOK TO ADD SOME ADDITIONAL UNITS TO THAT PROPERTY.

UM, IN ADDITION, WE HAVE SOME OTHER PROJECTS SUCH AS, UM, SORT OF A REPURPOSED AUTO REPAIR FACILITY AT 1316 BROADWAY AND THE OLD LONG JOHN SILVER RESTAURANT AT TWO 70 FLETCHER PARKWAY WILL SOON BE A NEW MISSION.

FEDERAL BANK.

UM, PROJECT IS PENDING FINAL APPROVAL AND, UM, AND NEW EXCITING PROJECT THAT WE HAVE IS THE FIRST LARGER RESIDENTIAL PROJECT OUT, UM, ON EL CAJON BOULEVARD WITHIN THE TRANSIT DISTRICT SPECIFIC PLAN.

UM, AND THEY'RE PROPOSING 116 NEW CONDOMINIUM TOWNHOMES.

UM, AND THAT'S AT THE SITE OF THE FORMER MASI VW DEALERSHIP, WHICH HAS BEEN VACANT FOR SOME TIME.

SO THAT CONCLUDES MY PROJECT UPDATES.

OUR PLAYED DIDN'T MOVE THROUGH THAT TOO QUICKLY.

IF YOU HAVE ANY QUESTIONS, I'D BE HAPPY TO FOLLOW UP ON IT.

I WOULD LOVE TO GET AN EMAIL WITH THAT LIST OF PROJECTS.

SINCE I LIVE ON OAKDALE, I'M ONLY AWARE OF TWO VACANT, LOTS ON OAKDALE.

ONE IS THE ONE WHERE I'M POINTING THE RIGHT DIRECTION.

UH, THE ONE WHERE WE HAD A PROJECT PROPOSED AND THEN THE ARCHITECT DESIGNER DIED.

AND SO THE PROJECT KIND OF INSTALLED, BUT I'M GUESSING WE'RE TALKING ABOUT DURHAM.

THAT'S THE OPPOSITE END ABOUT DALE, WHERE OAKDALE DOESN'T QUITE GO THROUGH TO THE NEXT STREET.

AND THERE'S A VACANT LOT.

THERE IS THAT, WHERE IS THAT? THE ONE THAT WE APPROVED A WHILE BACK THEN? I THINK THE OWNER PASSED AWAY IS THAT THAT LOT YOU'RE REFERRING TO, THAT WAS THE OTHER LOT.

SO BOTH ENDS OF OAKDALE HAVE AN EMPTY LOT.

OKAY.

UM, HAVE THEY SUBMITTED DRAWINGS YET ON THE 300 UNIT PROJECT? UH, THE 116, EXCUSE ME, THE HUNDRED 6,300 OUTCOME THEY HAVE SUBMITTED.

YEAH.

FOR THE SITE DEVELOPMENT PLAN PERMIT AND FOR THE TENTATIVE SUBDIVISION MAP.

OKAY.

WHEN CAN WE SEE THOSE? I'D LOVE TO SEE WHAT THAT PROJECT LOOKS LIKE.

YOU'LL BE SEEING THEM VERY SOON.

OKAY.

GOOD.

OKAY.

ALL RIGHT.

JEN, ANY OTHER QUESTIONS FOR STAFF? ANY COMMISSIONER REPORTS OR COMMENTS? ALL RIGHT, MR. WOULD YOU LIKE TO MAKE A MOTION? I MOVE TO ADJOURN TO MARCH 2ND, 2021.

ALL RIGHT.

MOTION MADE BY COMMISSIONER.

SO TLA SECOND BY COMMISSIONER PAUL GRUEN ROLL VOTE.

ALL RIGHT.

A COMMISSIONERS SERCO YES.

COMMISSIONER MOROSE.

YES.

COMMISSIONER.

SO TAYLOR, YES.

AND COMMISSIONER PAULA CRUDE MOTION IS CARRIED.

WE ARE ADJOURNED AT SEVEN 31.

OKAY.